Activating schedule flows

  • Freigeben Version: Australia
  • Aktualisiert 12. März 2026
  • 1 Minute Lesedauer
  • Activate the schedule flow that interacts with SuccessFactors to pull worker profile information and tasks into a ServiceNow application.

    Vorbereitungen

    Role required: sn_hr_sf.admin

    Prozedur

    1. Navigate to Flow Designer > Designer.
    2. Open Run Trigger SAP SuccessFactors Integrations.
    3. In the Trigger field, specify the time and interval at which you want to automatically run the scheduled flow.
    4. Click Activate.
    5. Expand Call Run SuccessFactors Service Subflow.

      Once data is pulled into staging tables, transform maps moves data into target tables. For more details, refer to Use transform maps.

      Hinweis:
      • For a partial pull, deselect the Retrieve all data check box. Partial pull is not supported for Department and Location. It is only supported for HR profile and Job Profile.
      • The Retrieve All Data check box is not supported for Pull To-Dos. The first pull will always be a full pull based on the configuration parameter Initial Load Date time. The subsequent ones are incremental pulls.
      • Before you run the flow, turn off reporting: com.snc.process_flow.reporting.level.