Control Assessment form
Use the Control Assessment form in the Advanced Risk application to assess the effectiveness of controls in mitigating risks.
See the following table for a description of the field values.
| Field | Description |
|---|---|
| Risk assessment methodology | Name of the risk assessment methodology used for control assessment. This field is automatically set based on your RAM. |
| State | State of the RAM. This field is automatically set to Draft. |
| Assessment contribution | Type of factor contribution. This field is automatically set to Qualitative contribution. |
| Calculate based on | Option to assess the types of control. Choices are the following:
|
| Control identification | Option to decide how to identify the controls in the risk assessment instance. The choices are the following:
This field appears only when the Calculate based on field has the value Individual assessment of controls. |
| Factor for overall effectiveness | Manual, automated, or group factors to assess controls. This field appears only when the option Individual assessment of controls is selected from the Calculate based on field. Only qualitative factors or factors with the option to transform the qualitative score will be displayed in this field. |
| Qualitative scoring logic | Formula for calculating the scoring logic. Choices are the following:
|
| Qualitative script variables | Format of the script and the variables used in the script. This field is available only when Script is selected from the Qualitative scoring logic field. |
| Qualitative script | User-defined script to compute the scoring logic. This field enables you to have more control over the score computation. |
| Section Labels | |
This section appears only when Configure section terminology is selected in the RAM form. Hinweis: Section label renaming applies only to the advanced risk assessment interface while leaving the terminology used in reports, dashboards, heatmaps, and other areas unchanged. |
|
| Title | Option to rename the section title of the assessment type. For example, if you rename Control assessment as Preventive assessment, the new title will be displayed in all sections where the Control assessment was previously referred. |
| Score label | Option to rename the qualitative score label in the Scoring section of the assessment form. For example, if you rename Control risk as Preventive risk, the new score label will be displayed in the scoring section where Control risk was previously referred. |