Reassign assessor for a risk assessment project

  • Freigeben Version: Australia
  • Aktualisiert 12. März 2026
  • 1 Minute Lesedauer
  • Reassign assessors for multiple in-progress risk assessment projects simultaneously to minimize disruptions during stakeholder transitions.

    Vorbereitungen

    Role required: sn_risk_advanced.risk_asmt_project_manager

    Prozedur

    1. Navigate to All > Risk > Risk Workspace.
    2. Select the list List icon. icon.
    3. From the list, navigate to Risk assessment projects, and select In progress.
    4. Select the Risk Assessment projects for which you want to reassign assessors.
      Reassign project dialog box appears.
    5. In the Reassign project dialog box, select the assessor in the Select assessor field.
    6. Select Confirm.