Work plan schedule fields for Enterprise Asset Management
Summarize
Summary of Work plan schedule fields for Enterprise Asset Management
This document details the fields used to configure work plan schedules within the Enterprise Asset Management (EAM) application in ServiceNow. Work plan schedules automate and control the timing and conditions under which maintenance or other asset-related work plans are executed. Understanding these fields helps customers precisely define triggers, timing, and conditions for planned work, improving asset management efficiency and compliance.
Show less
Key Fields and Their Functions
- Name: The identifier for the work plan schedule.
- Short description: A brief explanation of the work plan schedule purpose.
- Trigger: Defines the condition that initiates the work plan. Options include:
- Duration: Time-based triggers with configurable intervals such as daily, weekly, monthly, or annually.
- Meter: Trigger based on specific asset field values, useful for usage or condition metrics.
- Condition: Triggers based on filter criteria applied to asset data.
- Script: Advanced scripted logic for triggering work plans.
- Duration or Meter: Triggers on whichever condition (time or meter) occurs first.
- Active: Indicates if the schedule is currently enabled.
Trigger Configuration Details
- Duration Details: When Duration or Duration or Meter triggers are selected, specify:
- Trigger type (Interval, Weekly, Multiple days, Monthly, Annually, Week in Month, Day in Week in Month in Year)
- Parameters like days, hours, due day/time to define exact timing
- Lead time in days required for preparation
- Option to preserve calculated intervals to restart timing after work completion
- Meter Details: When Meter or Duration or Meter triggers are selected, configure:
- Enterprise asset field to monitor for trigger conditions
- Value thresholds that cause the work plan to run
- Option to preserve meter calculations for continuous tracking
- Condition Details: When Condition trigger is selected, define:
- Filter conditions combining multiple criteria using AND/OR logic
- Ability to create multiple condition sets for complex triggering scenarios
- Script Details: When Script trigger is selected, provide:
- Custom scripted criteria for advanced triggering logic
Effectivity Details
- Start planned schedule on: Determines how the schedule's start date is calculated, based on:
- Date
- Field Value from asset data
- Schedule name reference
- End planned schedule based on: Defines how the end date of the work plan schedule is determined.
Practical Application for ServiceNow Customers
ServiceNow customers using Enterprise Asset Management can leverage these work plan schedule fields to automate maintenance workflows accurately. By selecting appropriate triggers and configuring duration, meter, condition, or script details, customers ensure work plans execute at optimal times based on asset usage, condition, or business rules. Effectivity details allow alignment of schedules with asset lifecycle events, maximizing asset uptime and compliance with maintenance policies.
A detailed description of all the work plan schedule fields in the Enterprise Asset Management application.
Planned Work Schedule
| Field | Description |
|---|---|
| Name | Name of the work plan schedule. |
| Short description | Brief description of the work plan schedule. |
| Trigger |
Trigger that specifies the type of conditions that must be met for the work plan to run. Select one of the following options:
|
| Active | Option that indicates if the work plan schedule is active. |
Duration Details
| Field | Description |
|---|---|
| Trigger type |
Frequency at which you want the work plan to run. Select one of the following options:
|
| Lead time | Number of days required for the scheduled work plan. |
| Preserve calculated interval |
Option to restart the interval calculation from the time when the work order was completed. This check box appears when Interval, Monthly, or Annually is selected for Trigger type and Fixed is selected for the Monthly type and Annually type field. |
Meter Details
| Field | Description |
|---|---|
| Field | Enterprise asset field that you want to match against to trigger the work plan to run. |
| Every | Field value that an enterprise asset must match to trigger the work plan to run. |
| Preserve calculated meter |
Option to restart the meter calculation based on the value defined in the Every field. |
Condition Details
| Field | Description |
|---|---|
| Filter Condition |
Filter conditions that trigger the work plan to run You can add multiple filter conditions to the trigger using the following options:
|
Script Details
| Field | Description |
|---|---|
| Script | Script specifying the advanced criteria that trigger the work plan to run. |
Effectivity Details
| Field | Description |
|---|---|
| Start planned schedule on |
Option based on which the planned work schedule should determine its start date.
|
| Effective Start | Effective start date from when the planned work is scheduled to work. |
| Effective start reference |
Field value that should be used to determine the start date of the planned work. Effective start reference displays the list of fields from the table that is selected to create conditions for the work plan. For example, Printer [cmdb_ci_printer]. This field appears only when Field Value is selected from Start planned schedule based on. |
| Schedule |
Name of the schedule that should be used to calculate the start date of the work plan. This field appears only when Schedule is selected from Start planned schedule based on. |
| End planned schedule based on |
Determines the end date of a planned work schedule.
|