Determine if you're using the correct project task template for domain orders or order tasks by checking the sys_id of the project template task.
Before you begin
Role required: admin
Procedure
-
Navigate to All, and in the filter enter project_template_task.list.
-
Select the record for the project template task to be verified, and Get the sys_id from the header bar

For example, in the Project Template Task record for Product Order for SD-WAN Security, which belongs to the SD-WAN Package project template, the sys_id is 183910354fcd2110c5ff2624b2ce0b49.
-
Check the value of the sys_id in the associated Decisions table entry.
-
Navigate to and in the filter, enter sys_decision_question.list.
-
In the Decisions [sys_decision_question] table, locate the record of the corresponding decision table entry, for example Project Management Oversight for Domain Order.
-
In the record for the project template task, select the Answer column.
The resulting record for the Answer field opens.
-
In the resulting record for the Decision Table Multiple Result, view the XML output by right-clicking the header bar of the record and selecting Show XML.
-
Review the XML and locate the sys_id value in the file.
The sys_id value should match the sys_id of the project template task determined in Step 1. If the sys_id doesn't match, proceed to the next step.
-
In the Decision Table Multiple Result record, select the u_project_template_task and check the XML view of another project template task to verify the sys_id of the project task template.