Example- Schedule Optimization validation messages

  • Versão de lançamento: Australia
  • Atualizado 12 de mar. de 2026
  • 1 min. de leitura
  • An example of Schedule Optimization validation messages.

    • Example of an Error message type: Agent Missing Work Schedule – If a technician doesn’t have a defined work schedule, they’re excluded from the Optimization run.Schedule Optimization error message
    • Example of a Warning message type: Agent Missing Location – If a technician doesn’t have a home location assigned, they’re excluded from the Optimization run and aren't considered for task assignments.Schedule Optimization warning message