Configure a work schedule
After creating a work plan, it’s important to define specific criteria to determine when the plan should be executed. This includes defining the start date and end date for the plan's execution. To create a flexible work schedule for the plan, you can configure multiple work schedules for it and assign them accordingly.
Before you begin
Role required: sn_fsm_planned_wm.planned_work_admin and model_manager
You must create a work plan before configuring a work schedule for the plan.
About this task
You can create a single schedule or multiple schedules. For example, you can set up schedules for a class of computer to be rebooted on the first and fifteenth of every month.
When the scheduled job runs, it checks whether the value in the Next run time field is less than the time set for the next planned work nightly run job and if it is, the system generates a request. A planned nightly maintenance isn’t executed and a request is not generated based on the next run time.
A flexible work schedule can be created for multiple assets that belong to the same work plan based on their installation date. For example, on the Planned Work Schedule form, select Field Value as the start planned schedule based on, for multiple assets and then select Installed as the effective start reference. The schedule identifies the starting date of the planned work record based on the installation date of the assets that are associated with the work plan. With the Field Value start planned schedule based on selected, the Next run time field is populated in the Planned Work Records related list on the Work Plan form.
You can also create planned work schedules through the Planned Work Management Workspace. Navigate to , and then select the List icon ().
Procedure
Result
The schedule is created for a work plan. The Schedule Occurrences related list is added to the schedule to track the occurrence of maintenance cycles for the schedule.
The schedule occurrences are created automatically for duration-based schedules. However, if a different trigger option is selected for a schedule, the occurrence is created only when the specified condition or meter value is met. The creations of schedule occurrences depend on the effective end date. If no effective end date is specified, the application generates the next occurrence of the schedule.