Set term multiplier for contract renewal uplift

  • Freigeben Version: Australia
  • Aktualisiert 12. März 2026
  • 1 Minute Lesedauer
  • Use the renewal_uplift_term system property to select the contract duration basis used to calculate the renewal uplift term, either per year or per term.

    Vorbereitungen

    Role required: admin or pricing admin

    Prozedur

    1. Navigate to All and in the filter enter sys_properties.list.
    2. Open the renewal_uplift_term system property.
      The default value is per term, which means the term is for a specific period of time based on the contract.
    3. Do one of the following in the Value field:
      • To use a yearly basis for the uplift term multiplier, enter per year in the Value field.
      • To change the uplift term multiplier to per term, enter per term in the Value field.
    4. Select Update.
      Uplift calculations use the specified multiplier to calculate the contract duration basis.