# Scheduling auto-update of related assets

# Scheduling auto-update of related assets {#ariaid-title1}

Release version: Zurich  
Updated July 31, 2025  
![](https://www.servicenow.com/docs/portal-asset/ico-clock) 6 minutes to read
Summarize  
![AI sparkle icon](https://servicenow.com/docs/portal-asset/ai-sparkle-icon) Summarized using AI  
This content was generated using new OpenAI-powered functionality. Results are provided on an as is basis and are not guaranteed to be accurate or complete.  

## Summary of Scheduling Auto-Update of Related Assets

ServiceNow's Business Continuity Management (BCM) application enables administrators to schedule automatic updates of related assets in business continuity plans.
These updates are based on source data and relationships maintained in the Configuration Management Database (CMDB) and Business Impact Analysis (BIA) dependencies.
This automation ensures that plans stay current with asset dependencies, supporting accurate impact assessments and recovery planning.
Show full answer Show less  

## Key Features

* **Planning Dependency Update Configuration:** BCM administrators configure the auto-update settings via the Planning dependency update configuration module accessible through the Business Continuity Workspace. This one-time setup defines the sources (BIA upstream/downstream dependencies and CMDB) and filter conditions to determine which assets and plans are updated.
* **Auto-Update and Notifications:** When enabled, the system automatically updates related assets in plans and sends email notifications to plan owners about dependency changes.
* **Scheduled Job:** The *Update BCP dependencies snapshot* scheduled job runs regularly (weekly by default) to scan plans, apply updates based on the configuration, and create snapshot records capturing changes. System administrators can activate and trigger this job manually.
* **Manual Updates:** BCM users such as planners and managers can manually update dependencies at any time using the Update dependencies UI action, which applies the latest dependency data and creates snapshots if necessary.
* **Snapshot Records:** Each update creates a snapshot record detailing new, updated, or deleted assets per plan. Snapshots help track changes over time and are visible in the Pending updates module. Only one active snapshot per plan is maintained, with old completed snapshots purged after six months.
* **Data Relationships Framework Support:** The BCM application uses the Data Relationships Framework (installed by default) to efficiently fetch and manage asset relationships during updates.
* **Xanadu Release Enhancement:** Starting with the Xanadu release, updated dependencies from the latest BIA records include recovery objectives and tier information, enhancing dependency assessments and recovery planning.

## Roles and Responsibilities

* **BCM Administrators:** Configure the Planning dependency update module and activate scheduled updates.
* **BCM Program Managers, Planners, and Managers:** Update related assets in plans manually or monitor automated updates.
* **System Administrators:** Manage the scheduled job activation and execution.

## Practical Benefits for ServiceNow Customers

By leveraging this auto-update capability, BCM users can maintain accurate and timely asset dependencies in their business continuity plans with minimal manual effort. This ensures plans reflect current asset relationships, improving dependency assessments, recovery strategies, and stakeholder communication via notifications. The snapshot feature provides auditability of changes, supporting governance and compliance requirements.

Overall, this functionality streamlines dependency management, reduces manual errors, and enhances the BCM program's responsiveness to changes in the IT and business environment.  
You can schedule an auto-update of the related assets in the plans based on the source data and relationships in the CMDB. You can receive an email notification with details of the plan dependency updates from the BCM application. Dependencies are fetched from different sources such as BIA upstream dependency, BIA downstream dependencies, and CMDB.

## Scheduling an auto-update of the related assets {#import-cmdb-updates-in-plans__id_gsb_lwf_xzb}

Administrators can schedule an auto-update of related assets in plans using the Planning dependency update configuration module. The update is based on source data and relationships in the CMDB.

To access the configuration module, navigate to Business Continuity WorkspaceGeneral AdministrationPlanning dependency update configuration.

The Planning dependency update configuration module is shown in the example.

When the BCM administrators select the Auto-update dependencies option, the BCM application schedules an auto-update of the related assets in the plans. Similarly, when the Send notification option is selected, the BCM application sends automated emails to the plan owners about the dependency updates.  
Planning dependencies are fetched from different sources such as BIA upstream dependency, BIA downstream dependencies, and CMDB.  
Note:  
In the plans, the dependencies are fetched for all primary scope assets.

Setting up the Planning dependency update configuration module is a one-time activity. Once the sources are configured in the Planning dependency update configuration module, the updates are synchronized in the plan.

For more information on setting up the Planning dependency update configuration module, see [Configuring planning dependency updates](https://servicenow-prod.fluidtopics.net/bmLq0pqTd2KE16RExGLVug "Configure the Planning dependency update configuration record to schedule auto-updates of related assets in plans based on CMDB and BIA source data.").

## Using the updated dependencies with the Xanadu release {#import-cmdb-updates-in-plans__section_ffk_1nt_bcc}

Beginning with the Xanadu release, you can use the updated dependencies from the latest BIA record to conduct a dependency assessment on an asset. The following columns determine the required recovery timeframe and data backup needs:
Related item BIA, Related item Recovery Time Objective (RTO), Related item Recovery Point Objective (RPO), and Related item Recovery Tier. The results appear in the Required Recovery Timeframe and Required Data Backup columns of the
BIA record.

For more information on the source BIA records option in the Dependency configuration modules, see [Set up Planning dependency update configuration](https://servicenow-prod.fluidtopics.net/y~CSR0emgDt30j9R0OKtjw "Configure the Planning dependency update configuration record to configure the plan record (for which the dependencies are updated), its target records, sources, and notification preferences.").
Note:  
The filter condition in the Element definition is used to add specific configuration items (CIs) via the pop-up. The Update dependencies UI action also considers the element definition's filter and retrieves the related CIs of the configuration item listed in the Applies to field of the BIA. These relationships are retrieved from the CI Relationships table.

## Roles associated with the auto-update of the related assets in the plans {#import-cmdb-updates-in-plans__section_yps_f3q_hzb}

Users with these roles update the related assets in the plans:

* The BCM program managers, BCM planners, and BCM managers can update the related assets in the plans.
* BCM administrators can configure the Planning dependency update configuration module.
{#import-cmdb-updates-in-plans__ul_pdp_mnl_mzb}

## Using the scheduled job to auto-update the dependencies {#import-cmdb-updates-in-plans__section_mxn_ffq_hzb}

The Update BCP dependencies snapshot scheduled job is shipped as part of the base system. It runs at regular intervals and fetches the updated related assets in the plans. The scheduled job is shown in the
example.

The scheduled job is not marked as Active by default. To run the scheduled job at regular intervals, the system administrators can select the Active option and select Execute now to set
up a schedule. The scheduled job then runs at regular intervals, scans the plan records for the changes, and fetches the updated related assets for the planning records. It creates a snapshot record for each planning record
update.

The scheduled job processes a workflow to check for the changes in the relationships and save the dependency updates automatically as shown in the example.

1. The scheduled job runs weekly. It checks the related assets configuration for each planning record. It then fetches the related assets from the Sources tab of the Planning dependency update configuration module.
2. The scheduled job refers to the filter condition that is set in the configuration (Planning dependency update configuration module). If the condition matches the planning record, the scheduled job fetches the related assets and stores them in the snapshot record. The sources defined in the configuration determine which assets are fetched. If the filter condition does not match the planning record, the application skips the record.
3. Set the Send notification option to True in the Planning dependency update configuration module. The scheduled job then notifies users of the planning record about the updated related assets.
4. When the Auto-update dependencies option is set to True in the Planning dependency update configuration module, the scheduled job automatically applies the Plan dependency snapshot to the planning record.
5. As the final step, the scheduled job updates the planning record according to the fields to be updated in the configuration.
{#import-cmdb-updates-in-plans__ol_xt2_5xh_b1c}

## Updating the dependencies manually {#import-cmdb-updates-in-plans__section_vs5_hrq_rzb}

As the BCM application user, you can update the plan dependencies instantaneously by using the Update dependencies UI action. In this way, you can update the dependencies
manually before the scheduled job runs as per the weekly schedule. The dependencies are then updated in the sources and a snapshot record of the planning record update is created.

See the workflow for using the Update dependencies UI action and updating the planning dependencies manually:

1. The BCM planner navigates to the planning record. The application fetches the dependencies of the primary scope assets defined in the plan.
2. The BCM planner selects the Update dependencies UI action.
3. If the snapshot record exists for the update, the BCM planner applies the planning dependencies through the snapshot and updates the plan according to the Fields to be updated in the configuration. The plan
   workflow then continues for the next steps such as requesting review and approval.

   If the snapshot record does not exist for the update, the BCM planner checks if the planning record matches any configuration filter:
   * If the planning record matches any configuration filter, the application gets the dependencies in real time according to the sources in the configuration. Then, the BCM planner updates the planning record according to the Fields to be updated in the configuration. The plan workflow then continues for the next steps.
   * If the planning record does not match the configuration filter, the plan workflow then continues for the next steps.
   {#import-cmdb-updates-in-plans__ul_ihl_yg3_b1c}

{#import-cmdb-updates-in-plans__ol_n1l_n3z_czb}

For more information on updating the planning dependencies manually, see [Update the planning dependencies](https://servicenow-prod.fluidtopics.net/CVU5931zS_QBctMs3Zqh4w "Update the plan dependencies manually from the snapshot if the scheduled job is not activated in the Planning dependency update configuration module. You can update the dependencies in an active plan.").  
Note:  
Note:  
The Planning dependency update configuration module is used for using the scheduled job and for updating the planning dependencies manually (by using the Update dependencies UI action).

## Snapshot record of the plan {#import-cmdb-updates-in-plans__section_pqg_25l_mzb}

When the scheduled job runs at set intervals, it creates a snapshot record of each plan update in the application. The snapshot record contains the delta of the changes in the configuration such as new, updated, and deleted assets
for the plan. The snapshot records are listed in the Pending updates module in the Planning list view in the Business Continuity Workspace. A snapshot record is shown in the example.

When a snapshot record gets created, the application displays a UI message to inform the users about the planning dependency updates. The BCM application stores one active snapshot for a plan at a time. The snapshots that are in the Completed state and that have not been updated in six months are
removed from the application automatically.

If the planning record does not have any changes in the dependencies, then a snapshot record is not created for that planning record.

## Data Relationships Framework {#import-cmdb-updates-in-plans__section_cm5_2hl_mzb}

When you create a business continuity plan, you must update the related assets in the plans. Beginning with the Zurich release, the Data Relationships Framework (com.sn_app_grc_relationship_config) application supports the BCM application with the underlying framework to fetch the related assets in the plans. The Data Relationships Framework application is installed with the BCM application by default.

For more information on the Data Relationships Framework, see [Data Relationships Framework](https://servicenow-prod.fluidtopics.net/tiRVWcXhGuwhvIf1O5Cmzw "The Data Relationships Framework application (sn_grc_rel_config) supports the BCM application with the underlying framework. It fetches the dependencies in the BIAs, plans, and events from different sources such as CMDB, BIA, and BCP. Beginning with the Zurich release, the Data Relationships Framework (sn_grc_rel_config) application is installed with the BCM application by default.").
* **[Update the planning dependencies](https://servicenow-prod.fluidtopics.net/CVU5931zS_QBctMs3Zqh4w)**   
  Update the plan dependencies manually from the snapshot if the scheduled job is not activated in the Planning dependency update configuration module. You can update the dependencies in an active plan.