# Basic OT Change Model playbook

# Basic OT Change Model playbook {#ariaid-title1}

Release version: Yokohama  
Updated January 30, 2025  
![](https://www.servicenow.com/docs/portal-asset/ico-clock) 2 minutes to read
Summarize  
![AI sparkle icon](https://servicenow.com/docs/portal-asset/ai-sparkle-icon) Summarized using AI  
This content was generated using new OpenAI-powered functionality. Results are provided on an as is basis and are not guaranteed to be accurate or complete.  

## Summary of Basic OT Change Model playbook

The Basic Operational Technology (OT) Change Model playbook guides ServiceNow customers through the lifecycle of an OT change that does not require approvals.
It outlines the sequential stages---Initiate, Plan, Implement, and Close---that ensure proper documentation, scheduling, execution, and closure of OT changes.
Show full answer Show less  

## Initiate

This initial stage captures essential details about the requested change and assigns responsibility. Key tasks include:

* **Describe the change:** Provide a short description, detailed explanation, change category, site location, and specify watch and work notes lists for notifications.
* **Capture risk:** Define priority, risk level, and impact on industrial processes to assess urgency and potential effects.
* **Assign the change:** Identify the requester, assignment group (must be OT type), and individual assigned to perform the change.

## Plan

This stage focuses on preparing for the change by adding detailed plans and scheduling:

* **Justification:** Explain why the change is necessary.
* **Implementation plan:** Outline how the change will be executed.
* **Risk and impact analysis:** Document any risks and impacts related to the change.
* **Backout plan:** Define steps to reverse the change if required.
* **Test plan:** Describe how the change will be tested post-implementation.
* **Schedule the change:** Set planned start and end dates. The Scheduling Assistant tool can help select available downtime slots automatically.

## Implement

In this stage, the change is executed on targeted OT devices. Completion of the implementation task marks this stage as finished.

## Close

After successful implementation, the change record is formally closed by specifying a close code and any additional notes regarding the closure.  
Learn about the Basic Operational Technology (OT) Change Model playbook stages that an OT change without approvals must go through until it's completed.

## Initiate {#basic-ot-change-model__section_yvv_ygh_2xb}

The Initiate stage of an OT change request lets you capture the details of the requested change and assign the change as necessary. This stage has three tasks.{#basic-ot-change-model__table_yf4_ptm_2xb__entry__2}

| Field | Description |
|-|-|
| Short description | Brief description of the change. |
| Description | Details of the change. |
| Category | Type of change. |
| Site | Site where the change takes place. |
| Watch list | Users who receive notifications about this change when comments are added. |
| Work notes list | Users who receive notifications about this change when work notes are added. |
[Table 1. Describe the change]

{#basic-ot-change-model__table_yf4_ptm_2xb}{#basic-ot-change-model__table_ybq_t5m_2xb__entry__2}

| Field | Description |
|-|-|
| Priority | Impact and urgency to identify how quickly the change should be addressed. |
| Risk | Amount of risk that the change poses. |
| Impact | Measure of the effect that a change has on your industrial processes. |
[Table 2. Capture risk]

{#basic-ot-change-model__table_ybq_t5m_2xb}{#basic-ot-change-model__table_npn_55m_2xb__entry__2}

| Field | Description |
|-|-|
| Requested by | User who requests the change. |
| Assignment group | Assigned group that works on the change. The assignment group can be any group with the type OT. |
| Assigned to | User who works on this change. If the assignment group changes, the Assigned to field is cleared. |
[Table 3. Assign the change]

{#basic-ot-change-model__table_npn_55m_2xb}

## Plan {#basic-ot-change-model__section_fd3_zgh_2xb}

The Plan stage of an OT Change request lets you add a justification for the change, an implementation plan, a risk and impact plan, a backout plan, a test plan, and a time to schedule the change. This stage has six tasks.
{#basic-ot-change-model__table_jpd_kxm_2xb__entry__2}

| Field | Description |
|-|-|
| Justification | Reason why the change must take place. |
[Table 4. Add a justification]

{#basic-ot-change-model__table_jpd_kxm_2xb} {#basic-ot-change-model__table_exq_kxm_2xb__entry__2}

| Field | Description |
|-|-|
| Implementation plan | Details of how to implement the requested change. |
[Table 5. Add implementation plan]

{#basic-ot-change-model__table_exq_kxm_2xb} {#basic-ot-change-model__table_cxg_lxm_2xb__entry__2}

| Field | Description |
|-|-|
| Risk and impact analysis | Details of any risk and impact factors that are related to this change. |
[Table 6. Add risk and impact analysis]

{#basic-ot-change-model__table_cxg_lxm_2xb} {#basic-ot-change-model__table_zlb_mxm_2xb__entry__2}

| Field | Description |
|-|-|
| Backout plan | Details of how to reverse the change in place if necessary. |
[Table 7. Add backout plan]

{#basic-ot-change-model__table_zlb_mxm_2xb} {#basic-ot-change-model__table_a3s_mxm_2xb__entry__2}

| Field | Description |
|-|-|
| Test plan | Details of how to test the implemented change. |
[Table 8. Add test plan]

{#basic-ot-change-model__table_a3s_mxm_2xb} {#basic-ot-change-model__table_edj_nxm_2xb__entry__2}

| Field | Description |
|-|-|
| Planned start date | Date that the change takes place. Note: You can also choose an available downtime slot on the calendar by selecting the Scheduling Assistant button to fill in the planned start date field automatically. |
| Planned end date | Date that the change ends. Note: You can also choose an available downtime slot on the calendar by selecting the Scheduling Assistant button to fill in the planned end date field automatically. |
[Table 9. Schedule the change]

{#basic-ot-change-model__table_edj_nxm_2xb}

## Implement {#basic-ot-change-model__section_g25_jhh_2xb}

The Implement stage of an OT change request provides the details of the following task. You can mark this stage as complete when it's finished.

Perform the change
:   Mark as complete when the change is performed on the targeted OT devices and completed.

## Close {#basic-ot-change-model__section_bqr_lhh_2xb}

The Close stage lets you close the change record after the change is completed.{#basic-ot-change-model__table_lft_lkn_2xb__entry__2}

| Field | Description |
|-|-|
| Close code | Reason that the change record was closed. |
| Close notes | Additional details about closing the change record. |
[Table 10. Close the change record]

{#basic-ot-change-model__table_lft_lkn_2xb}