# Important planned task table fields

# Important planned task table fields {#ariaid-title1}

* Release version: Xanadu
* 
* Updated August 1, 2024
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 minute to read

The Planned Task table has these fields.
{#r_ImportantPlannedTaskTableFields__table_llj_p23_dp__entry__4}

| Label | Name | Type | Description |
|-|-|-|-|
| Actual cost | `work_cost` | currency | The actual cost of the planned task, to be compared with the Estimated cost. |
| Actual duration | `work_duration` | glide_duration | The actual length of time (from start time to end time) of work on the planned task, to be compared with the Planned duration. |
| Actual effort | `work_effort` | glide_duration | The actual time spent working, to be compared to the Planned effort. |
| Critical Path | `critical_path` | boolean |   |
| Estimated cost | cost | currency | An estimation of the cost of the planned task, to be compared with the actual cost. |
| HTML Description | `html_description` | html | A description field that accepts HTML mark-up. |
| Percent Complete | `percent_complete` | decimal | A percentage of the completed effort. Generated using the Planned effort and Actual effort fields. |
| Planned duration | duration | glide_duration | The estimated length of time (from start time to end time) of the planned task. |
| Planned effort | effort | glide_duration | The estimated amount of time spent working on the planned task. |
| Planned end date | `end_date` | glide_date_time | The estimated date and time for the planned task to end. |
| Planned start date | `start_date` | glide_date_time | The estimated date and time for the planned task to start. |
| Remaining duration | `remaining_duration` | glide_duration | The difference in planned and actual duration, representing the time left for the planned task. |
| Remaining effort | `remaining_effort` | glide_duration | The difference in planned and actual effort, representing the amount of work time left for the planned task. |
| Rollup | rollup | boolean | Read-only field managed by the system that identifies the task as having child tasks. A rollup task has several its fields calculated from the children so those fields are read-only. |
| Time constraint | `time_constraint` | string | A description of time constraints that apply to the planned task. |
| Top Task | `top_task` | reference (planned_task) | When different planned tasks are stacked in a hierarchy, this field populates with the highest-level parent task. For example, if Project A has a child Project B, and Project B has a child Project C, then the Top Task for Project C is Project A. The Top Task field for Project A is blank. |
| Actual start date | `work_start` | glide_date_time | The actual date when the work starts on the planned task. |
| Actual end date | `work_end` | glide_date_time | The actual date when the work ends on the planned task. |
[Table 1. Important Planned Task Table Fields]