Create a phase part allocation

  • Versão de lançamento: Australia
  • Atualizado 12 de mar. de 2026
  • 1 min. de leitura
  • Create an allocation entry for a required part.

    Antes de Iniciar

    Role required: sn_rcl_claim_mgmt.recall_manager

    Nota:
    Phase part allocation can only be created for leaf phases.

    Procedimento

    1. Navigate to Workspaces > CSM/FSM Configurable Workspace > Lists > Recall Management > My Campaigns > Recall Campaign Phases.
    2. Select a leaf phase.
    3. Select Recall Phase Part Allocations.
    4. Select New.
    5. On the form, fill in the following fields.
      Tabela 1. Recall phase part allocation form
      Field Description
      Number Recall phase part allocation number that is automatically generated. The number starts with RCPHPA.
      Recall campaign part requirement Part required for the recall phase campaign.
      Source Campaign part availability record.
      Quantity allocated Quantity.
      Recall campaign phase Recall campaign phase for which the recall phase part allocation is created.
    6. Select Save.