---
sourceDocument: Australia Manufacturing
sourceDocumentLink: https://servicenow-prod.fluidtopics.net/r/pt-BR/manufacturing

 Release :

    - australia

ft:locale :

    - pt-BR

ft:publication_title :

    - Australia Manufacturing

ft:clusterId :

    - mftg

bundleId :

    - mftg

workflow :

    - Customer and Industry


---

# CoPQ planned line charge form

# CoPQ planned line charge form {#ariaid-title1}

* Versão de lançamento: Australia
* 
* Atualizado 12 de mar. de 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 min. de leitura

The CoPQ planned line form enables you to add the required details.
{#mco-copq-planned-line-charge-form__table_uky_wgq_xhc__entry__2}

| Field | Description |
|-|-|
| Number | CoPQ planned line charge number that is automatically generated. The number starts with PLC and is incremented for every new report. |
| State | State of the preventive action: * New * On hold * In progress * Closed complete * Closed canceled * Closed incomplete {#mco-copq-planned-line-charge-form__ul_bw1_fbk_whc} |
| Financial request | Financial request that inks planned line charge to the parent CoPQ financial request. |
| CoPQ type | CoPQ type that categorizes the cost as material/part-related or labor-related. |
| Product model | Model type. |
| Quantity | Quantity of the item/service planned. |
| Unit of measure | Number of product quantities. |
| Unit cost | Cost of each product. |
| Planned cost | Planned cost allocated to address the issue through the request. |
| Actual cost | Actual cost incurred for the CoPQ request. |
[Tabela 1. CoPQ planned line charge form]

{#mco-copq-planned-line-charge-form__table_uky_wgq_xhc}

