# Update a cost plan breakdown

# Update a cost plan breakdown {#ariaid-title1}

* Versão de lançamento: Australia
* 
* Atualizado 12 de mar. de 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 min. de leitura

Update a cost plan breakdown record that specifies the estimated and actual cost, at
a granular level, for specific fiscal periods.

## Antes de Iniciar

Role required: it_project_manager

## Procedimento

1. Open the required project.
2. Select the Cost Plan related list.
3. Select the Cost Plan Breakdowns related list.
4. Select the i icon against a cost plan breakdown.
5. Select Open Record.
6. In the Cost Plan Breakdown form, view and update the enabled fields.  
   For more information, see [Cost plan breakdown form](https://servicenow-prod.fluidtopics.net/5GGPosaU74S8EfhG9KKLLQ "Learn and update the enabled fields of cost plan breakdown form.").
**Conceitos relacionados**   

* [Cost plan breakdown](https://servicenow-prod.fluidtopics.net/HFCUvdtn77ZK5cI4HNR0tA#cost-plan-breakdown "A cost plan breakdown captures the estimated cost and actual cost for every fiscal period. Cost plan, project, demand, program, and portfolio are the breakdowns types that are available.")
* [System-generated cost plans](https://servicenow-prod.fluidtopics.net/HFCUvdtn77ZK5cI4HNR0tA#system-generated-costplan "When an expense line is created without populating the Cost Plan field, system-generated cost plans are created automatically.")