---
sourceDocument: Australia Strategic Portfolio Management
sourceDocumentLink: https://servicenow-prod.fluidtopics.net/r/pt-BR/it-business-management

 Release :

    - australia

ft:locale :

    - pt-BR

ft:publication_title :

    - Australia Strategic Portfolio Management

ft:clusterId :

    - itbm

bundleId :

    - itbm

workflow :

    - Technology


---

# Access the project workbench

# Access the project workbench {#ariaid-title1}

* Versão de lançamento: Australia
* 
* Atualizado 12 de mar. de 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 min. de leitura

Access the project workbench from the Project form or from the application
navigator.

## Antes de Iniciar

Role required: it_project_manager

## Procedimento

Access the project workbench in one of the following ways.

| Option | Steps |
| From Planning Console | 1. Open a project record in [project workspace](https://servicenow-prod.fluidtopics.net/KXBAwuBaiWdVXHw8V9_LAA "Open the project workspace to display all your projects at a single location."). 2. Select the Planning tab. 3. Select the Planning Console selection arrow on the banner and select Project Workbench. {#t_AccessTheProjectWorkbench__ol_nql_mgn_sdb} |
| From a project record | 1. Navigate to a project record in Details tab in project workspace. 2. Select the Project Workbench related link. {#t_AccessTheProjectWorkbench__ol_kxt_wgn_sdb} |
|-|-|

{#t_AccessTheProjectWorkbench__choicetable_rvp_hgn_sdb}  
Nota:  
If the project workbench opens with no associated sys_id or an incorrect sys_id, an error message appears. Select a project from the project choice list in project workspace banner.
**Conceitos relacionados**   

* [Components of project workbench](https://servicenow-prod.fluidtopics.net/M06BgJVvY4Qu4_qt_dBh_w "The project workbench displays project information in two distinct areas. The top pane displays the project visualization, and the bottom pane displays phase details in a list view or visual task board. There is also a header above the workbench that includes several buttons and controls.")
* [Project calculation](https://servicenow-prod.fluidtopics.net/zjUNcOqEs4GkV0W4N2QHRQ "When creating a project, the project manager can select the type of calculation to use: manual or automatic (default).")
* [Managing Project workbench](https://servicenow-prod.fluidtopics.net/oj56_CN0Tn49D~35XRNJVA "The project workbench allows project managers to manage all aspects of a project.")
* [Using Project workbench - Legacy](https://servicenow-prod.fluidtopics.net/a~c~KFcZn0BfpH6S2EFaow "The project workbench provides a central location for creating and managing projects.")

