Activate a scheduled job to generate labor costs for your projects and demands

  • Versão de lançamento: Australia
  • Atualizado 12 de mar. de 2026
  • 1 min. de leitura
  • Activate a scheduler job to automatically create labor costs for attribute-based resource assignments.

    Antes de Iniciar

    Role required: admin

    Procedimento

    1. Navigate to All > System Definition > Scheduled Jobs.
    2. Filter the name field to locate the Generate Labor Costs scheduled job and open it.
    3. Select Active and on the Scheduled Script Execution form, fill the fields.
    4. Select Update to save your changes or Execute Now to run the scheduled job.