---
sourceDocument: Australia Strategic Portfolio Management
sourceDocumentLink: https://servicenow-prod.fluidtopics.net/r/pt-BR/it-business-management

 Release :

    - australia

ft:locale :

    - pt-BR

ft:publication_title :

    - Australia Strategic Portfolio Management

ft:clusterId :

    - itbm

bundleId :

    - itbm

workflow :

    - Technology


---

# Create a copy of work items in EAP Backlog

# Create a copy of work items in EAP Backlog {#ariaid-title1}

* Versão de lançamento: Australia
* 
* Atualizado 12 de mar. de 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 min. de leitura

For creating work items with details similar to an existing item, save time and effort by creating a copy of the existing item.

## Antes de Iniciar

[Create work items for teams in EAP Backlog](https://servicenow-prod.fluidtopics.net/vDPGeelQihPPeP4oQ7h1dQ "Create stories, features, epics, or capabilities for teams to add work to their backlog in Enterprise Agile Planning.").

Role required: sn_apw_advanced.eap_user

## Procedimento

1. Navigate to WorkspacesStrategic Planning WorkspaceEnterprise Agile Planning.
2. From the Agile structure section of the left navigation panel, choose your EAP team.
3. From the Backlog page, locate the item that you want to create a copy of.
4. Select the more icon (![More icon.]()) and select Create copy.  
   Alternatively, you can right-click the work item to view these options.

## Resultado

A copy of the selected work item is created, with the information in the required fields copied over. This new work item is added to the same section as the original. For example, if you created a copy of a Story from the
Backlog section, then the copied story is added to the Backlog section.

## O que Fazer Depois

From the full details page of the work item, you can refine the description with Now Assist. See [Improve efficiency and quality using refine records skill with Now Assist Context Menu (NACM)](https://servicenow-prod.fluidtopics.net/tNyTuLh1bTTI4qNEPWLhpg "Improve record quality by enabling AI-assisted text refinement in the text fields of Product idea, Demands, Epic, Projects, Capability, Features, Stories, Project tasks, Risks, Strategic priorities, Goals, Targets, Initiatives, Feedback, Milestones, and Story forms."). This feature requires activating the Write planning item skill of Now Assist for SPM. For more information, see [Configure Now Assist for Strategic Portfolio Management (SPM)](https://servicenow-prod.fluidtopics.net/wO7Hj~gJVlbJT7GwjlDqNQ "If you have the admin role, you can configure the Now Assist for Strategic Portfolio Management (SPM) application to enable generative AI skills in Strategic Planning, Project Workspace, Demand Management, or Enterprise Agile Planning.").
**Conceitos relacionados**   

* [Manage team backlog in EAP](https://servicenow-prod.fluidtopics.net/gidX~_hnpyszzKt2krSorA "Using the Backlog page of Enterprise Agile Planning, create, update, and prioritize work items. Additionally, schedule work items into iterations such as Planning Intervals (PI) or Sprints.")  
**Tarefas relacionadas**   

* [Schedule work items into iterations in EAP Backlog](https://servicenow-prod.fluidtopics.net/BCioBkyqxc3ODXZ64w9adA "Perform backlog grooming and schedule work from the team's backlog for the upcoming iteration Enterprise Agile Planning.")

