Commit diagram changes

  • Versão de lançamento: Australia
  • Atualizado 12 de mar. de 2026
  • 1 min. de leitura
  • Synchronize an approved diagram and all its elements to the database.

    Antes de Iniciar

    Role required: sn_apm.apm_analyst

    Nota:
    You must have the Owner or Editor access to the artifact or diagram.

    Procedimento

    1. Navigate to Workspaces > Enterprise Architecture Workspace.
    2. Open the Modeling page by selecting the Enterprise Modeling and Visualization icon (Modeling).
    3. Select an existing diagram from the Diagrams page.
    4. Select Commit changes.
    5. Synchronize the diagram by selecting Commit.

    Resultado

    The diagram is synced to the ServiceNow database.