---
sourceDocument: Australia Enterprise Architecture (formerly Application Portfolio Management)
sourceDocumentLink: https://servicenow-prod.fluidtopics.net/r/pt-BR/application-portfolio-management

 Release :

    - australia

ft:locale :

    - pt-BR

ft:publication_title :

    - Australia Enterprise Architecture (formerly Application Portfolio Management)

ft:clusterId :

    - appportman

bundleId :

    - appportman

workflow :

    - Technology


---

# TRM technical debt form

# TRM technical debt form {#ariaid-title1}

* Versão de lançamento: Australia
* 
* Atualizado 12 de mar. de 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 min. de leitura

The Technology Reference Model (TRM) technical debts that are created for the products that aren't aligned with the TRM phases and standards.
{#eaw-trm-technical-debt-form__table_ak2_5fg_tyb__entry__2}

| Column name | Description |
|-|-|
| TRM product | Name of the TRM product. A software product that is having version-specific life cycles. |
| Business Application | Name of the business application associated with the TRM product. |
| Server | Name of the server related to the TRM product. Nota: This field is available from Technology Portfolio Management (TPM) plugin version 1.7.1. |
| Software product model | Name of the software product model related to the TRM product. |
| Software product | Name of the software product related to the TRM product. |
| Operating system | The operating system on which the TRM product can be deployed. This field appears on when Software is selected in the Type field. |
| TRM phase | Phase of the TRM product. The following TRM phases are available from the base system: * Approved: The technology is approved for use. * Approved with Constraints: The technology can be used within the specified constraints specified in the comments. * Divest: A decision was taken to divest from the use of the technology. * Evaluation: This technology is being evaluated and can't be used to production purposes. * Unapproved: The technology isn't permitted to be used. {#eaw-trm-technical-debt-form__eaw-create-trm-phase_define-trm-phases_ul_ghz_pcg_d5b} Nota: You can modify these phases from the EA WorkspaceSetupTRM Phases |
| TRM level | The level (Product or Product Lifecycle) at which the technical debt is created. |
| Version | Version of the software product. Usually, the name of the Software product model contains this version. |
| Reason | The reason to explain why the technical debt was created. |
| Last run | Shows the timestamp when the custom scheduled job Populate TRM technical debts in the EA Workspace is run to update the table with technical debt. |
[Tabela 1. Technical Debt form fields]

{#eaw-trm-technical-debt-form__table_ak2_5fg_tyb}
**Conceitos relacionados**   

* [Manage TRM technical debt](https://servicenow-prod.fluidtopics.net/eeQ1W2QM4Du1wuY~KvVmwQ "Manage the TRM technical debts that are created for the products that aren’t approved for the usage.")  
**Tarefas relacionadas**   

* [View TRM technical debts](https://servicenow-prod.fluidtopics.net/eOQz8uXt264ZIWLCGYTWfA "You can view the Technology Reference Model (TRM) technical debts that are created for the products that aren’t aligned with the TRM phases and standards.")

