# Enable cost rollup calculations

# Enable cost rollup calculations {#ariaid-title1}

Release version: Australia  
Updated March 12, 2026  
![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 minute to read  
Enable rollup calculations from the project properties.

## Before you begin

Role required: it_project_manager

## Procedure

1. Navigate to AllProjectSettingsPreferences.
2. Select Enable project cost rollup.
3. Select Save.

## Result

Rollup values are read-only on forms. Point to the icon beside the field for a tooltip message.Figure 1. Tooltip
**Related tasks**   

* [Create a project cost plan](https://servicenow-prod.fluidtopics.net/BnG9nHAzYxV0YlqP2hAxug "Create a cost plan to specify the unit cost of a cost type for a fiscal period. Project cost plans capture the costs of projects.")
* [Update a cost plan breakdown](https://servicenow-prod.fluidtopics.net/iyITCnnxZXoCU7PSmlfyFQ "Update a cost plan breakdown record that specifies the estimated and actual cost, at a granular level, for specific fiscal periods.")

*[\>]: and then