---
sourceDocument: Australia Field Service Management
sourceDocumentLink: https://servicenow-prod.fluidtopics.net/r/de-DE/field-service-management

 Release :

    - australia

ft:locale :

    - de-DE

ft:publication_title :

    - Australia Field Service Management

ft:clusterId :

    - fsm

bundleId :

    - fsm

workflow :

    - Customer and Industry


---

# Configure resources to load

# Configure resources to load {#ariaid-title1}

* Freigeben Version: Australia
* 
* Aktualisiert 12. März 2026
* 
* ![](https://www.servicenow.com/docs/portal-asset/ico-clock) 1 Minute Lesedauer

Administrators can configure the number of resources to load on the calendar in Dispatcher Workspace so the page loads faster with fewer resources. Or the dispatcher can see more information at a glance if more resources are loaded.

## Vorbereitungen

Role required: wm_admin

## Warum und wann dieser Vorgang ausgeführt wird

Before the Australia release, the system property `sn_fsm_disp_wrkspc.calendarCollapsedBehavior` controlled the behavior of whether all the groups, other than the first group, would be collapsed when Dispatcher Workspace loads. From the Australia release onwards the `sn_fsm_disp_wrkspc.calendarCollapsedBehavior` is removed and the behavior is controlled by the
`sn_fsm_disp_wrkspc.dispatcher_workspace.calendar_resources_page_size`, which determines the number of resources that's loaded on the page.

By default the calendar in Dispatcher Workspace shows 15 resources loaded on the calendar. You can update a system property to change the number of expanded resource schedules. The default value can be changed to a number between 1
and 100. However, if you enter a value over 30, there will be an impact on the page load time in Dispatcher Workspace.

The image below shows what Dispatcher Workspace looks like with the default number of resources added.

## Prozedur

1. Navigate to All and type `sys_properties.list`, then press Enter or Return on your keyboard.
2. Search for and select the `sn_fsm_disp_wrkspc.dispatcher_workspace.calendar_resources_page_size` property.
3. Change the property in the Value field to a number between 1-100.  
   Hinweis:  
   Entering a number over 30 will impact Dispatcher Workspace load time.
4. Select Update.

