Configure paths for different failure code conditions
Configure a path for each failure code condition to provide appropriate guidance to agents.
Vorbereitungen
Role required: admin, sn_gd_core.decision_tree_author
Warum und wann dieser Vorgang ausgeführt wird
When the failure code received by the customer is 200, the path that leads to the Reassign case guidance is taken.
For more information about how to configure a path, see Determine the next node displayed in a decision tree.
Prozedur
Nächste Maßnahme
Configure paths for other failure codes:
- 300 failure code - This path leads to the Create work order guidance.
- 500 failure code - This path leads to the Assign IT technician guidance.